Cochran Gardens
Portfolio
Phase I included 3 city block, 121 multi-family units within a twenty building complex.
Phase II consisted of constructing on 4 city blocks, 102 multi-family apartments within a twenty-one building complex. Packages developed included Public Improvements, Site Preparation; Building and on-site Improvements. Additional features included Demolition: existing roads; excavate to and cap existing aboveground and underground utilities; landscaping; Site work: new road construction; excavate to and tap existing utilities; ornamental fencing and security gates; new and existing relocations and additions for aboveground and underground utilities (storm sewer, sanitary sewer, irrigation, fire suppression, telephone, electric, traffic control and signaling, communications). Building construction – Shell: “sub-floor construction, walls (brick, CMU, alum siding) and roof (vents, skylights); balconies and railings; exterior windows and doors; plumbing piping; HVAC; and electrical. Finishes: floors, walls, ceilings: CT, QT, wood, carpet, drywall and painting, wood railings, doors, cabinets, countertops, plumbing fixtures, HVAC, and electrical. Systems: security, communications, fire protection and suppression